This line drawing depicts the addition of new loads, as new equipment, to an electrical system.

How to conduct load studies with a power quality logger

When adding new loads to an existing electrical service or set of feeders, the first thing to determine is whether the existing system is capable of supporting the new loads. When evaluating, you first need an understanding of the circuit's existing loading.

To determine the existing equipment’s capacity, factor in the incoming conductor size, the ratings of the equipment, and space for new circuits. To determine present loading, you’ll need to either precisely calculate the existing loads, or measure them. Calculations are defined in local electrical code, for example NEC 220. The calculation method requires a year’s worth of demand data. The alternative to finding your maximum demand is to measure your demand over a span of 30 days, or as specified by your local code regulations. This is known as the load study.

Four-step process

  1. Hook up the feeders or service—Using proper personal protective equipment (PPE), connect the logger to the line power and secure the area so no one will tamper with your setup.
  2. Set power system parameters—Set your logger to 15-minute averaging intervals and a 30-day recording duration. The 15-minute average time is specified in the local code.
  3. Start recording—On the Power display your logger should display a min, max and average of these values every 15 minutes:
    • Power in Watts for each phase and total
    • Reactive Power in VARs for each phase and total
    • Apparent Power in VAs for each phase and total
    • Power Factor in percentage or unitless, as it has a ration of volt-amps, for each phase and average
    • Averages of Energy in kWh and Reactive Energy in kVARh
  4. Download and review the measurements—For 30 days of recording, with a measurement every 15 minutes, you will have 2880 sets of measurements. Use the application software to graph this data, find the maximum current or power on each phase, compare the three phases and report the largest number. This will help you get an accurate picture of the system load, help design a safe upgraded system and satisfy electrical authorities.

Remember that local authorities are responsible for interpreting the electrical code and measurements. Local regulations determine when a load study must be performed, what information is required and the review process.

Recommended Products
Fluke 1742, 1746 and 1748 Three-Phase Power Quality Loggers»
See specifications »
Fluke 1732 and 1734 Three-Phase Electrical Energy Loggers »
See specifications »
Fluke 1760TR Three-Phase Power Quality Recorder »
See specifications »
Fluke 1760 Three-Phase Power Quality Recorder »
See specifications »

Was this helpful?
Recommended Resources
©2018 Fluke Corporation. Specifications subject to change without notice. 6009692

Power Quality Fundamentals

Information on the analysis and monitoring of power quality in industrial settings